17 May 2011 (day 62) - Roof Frame delivered

Carpenters still work at the site. Wonders how far they have done at site and while waiting for the kids finishing instruments lesson, I drove down to the site at around 4.30pm, hope they have gone home.

Guess what I saw.
At the front of the house, there are a big truck and another crane blocking the road as shown at the pictures:



Apparently they are going to deliver the frame of the roof, but because they are more wider than the gate, they have to bring them one by one inside like these:



 going straight to the backyard and u turn at the tennis court


then put it straight to the top of the wall frame erected.


 All of these frames will be brought inside that way.

They have covered some frames with 3mm plywood sheets.

These trademen are working hard, around 5 pm still at the site. Excellent