They also prepared the edging of the slab with wood to shape and determine the height of the slab concrete.
I think, they used at least 9-10 loads truck of sand.
The height of sand bedding is measured and adjusted accordingly.
Some posts are flash back, as we are new and beginner blogger. But we will try to catch up to date. Thanks for all senior blogger which allow us to make decision when we face the same situation. All comments and input are wellcome. Cheers
No comments:
Post a Comment